kerching Posted December 5, 2009 Share Posted December 5, 2009 Sorry if this is in the wrong place but hopefully someone maybe able to help. I am managing Cambridge Utd in div1 on FM2008. At the start of the past couple of season the board announce that the stadium capacity will be increased by about 3500. The work is completed about halfway through a season and the capacity is increased but it is not saved, so the stadium capacity remains the same at about 9000. Most frustrating.:mad::mad: Link to post Share on other sites More sharing options...
Just-Wool Posted December 5, 2009 Share Posted December 5, 2009 Did you patch it up, it was a known bug on fm 08 which the last bug fixed iirc. Link to post Share on other sites More sharing options...
baker.simon Posted December 5, 2009 Share Posted December 5, 2009 monkeywool - Quality location buddy. Its said too often but i did actually LOL Link to post Share on other sites More sharing options...
kerching Posted December 5, 2009 Author Share Posted December 5, 2009 Did you patch it up, it was a known bug on fm 08 which the last bug fixed iirc. Thanks. I,ll give that a try if i can find patch. Link to post Share on other sites More sharing options...
Just-Wool Posted December 5, 2009 Share Posted December 5, 2009 I do try to bring much needed joy to these forums at times. Link to post Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.